Work planning and timetable
|
T1.1
|
Organize a kick-off meeting
|
[7.1e]
|
|
T1.2
|
Identifying and joining actors (life sciences research, industry and SME's, health care)
|
[7.1b,g]
|
|
T1.3
|
Organize the symposia to be contributed to the ELSO, ICBL and Euro Fed Lipid Meetings
|
[7.1c]
|
|
T1.4
|
Write a position paper on the Life Sciences landscape
|
[7.1h]
|
|
T1.5
|
Organize a general meeting
|
[7.1e,f]
|
|
T1.6
|
Set-up and maintain an interactive website
|
[7.1d]
|
|
T2.1
|
Design a Lipodomics Expertise Platform
|
[7.1b]
|
T2.2
|
Organize a workshop 'Lipidomics and Technology
|
[7.1e]
|
T2.3
|
Write a position paper on the need for expert platforms for shaping the Metabolomics field
|
[7.1h]
|
T2.4
|
Hold a survey of expertise and infrastructure within the Lipidomics field
|
[7.1a,d]
|
|
T3.1
|
Organize a workshop “Dynamic Lipid Organization in Cells”
|
[7.1e]
|
T3.2
|
Organize a workshop “Lipidomics and Health”
|
[7.1e]
|
T3.3
|
Organize an industry meeting on applications for Metabolomics and Lipidomics
|
[7.1c,g]
|
|
T4.1
|
Ratification of Work Plans
|
[7.1i]
|
T4.2
|
On-line Management Tools available
|
[7.1i]
|
T4.3
|
Semi-annual project plan update (on-line)
|
[7.1i,h]
|
T4.4
|
Project presentation
|
[7.1i,h]
|
T4.5
|
Annual Meetings plus Reports
|
[7.1i,h]
|
T4.6
|
Final plan for using and disseminating knowledge
|
[7.1i,h]
|
T4.7
|
Report on raising public participation and awareness
|
[7.1i,h]
|
Work planning, showing the timing of the different WPs and their components
The Black bars indicate the duration of the entire work package; the light grey bars indicate general networking meetings; the dark grey bars indicate dedicated scientific meetings; the white bars indicate activities other than meetings. Activities ending with a white circle around a small diamond inside indicate activities that lead to a tangible result such as a report or a prototype. The black diamonds indicate meetings following a phase of organisation.
|